A closer look · utilities · Hong Kong

The 8% behind the power bill.

HK Electric’s fuel charge went from 26.0 cents a unit in May to 60.7 in September. The company says it makes no profit on fuel. I read the contract behind the bill to find where its return comes from.

A Hong Kong Island power bill has two parts, and each one follows its own rule.

The Fuel Clause Charge follows what HK Electric pays for gas and coal. The Basic Tariff pays for everything else. HK Electric’s 25 August release puts September’s average net tariff at 188.6 cents a unit, of which 60.7 cents is fuel.

The fuel part runs through the Fuel Clause Recovery Account. The agreement defines it from the difference between the standard cost of fuel and the actual cost, “passed on to the consumers by way of rebates or charges”. When fuel costs rise, customers pay the difference. When they fall, customers get it back.

HK Electric’s press release of 26 March 2026 says fuel costs are incorporated “based on a pass-through mechanism without making any profit, as stipulated under the Scheme of Control Agreement”. Its 2026 interim results put this year’s rise down to “the closure of the Strait of Hormuz”, with gas-fired generation at nearly 70% of its output. Sources: the agreement, Sch. 1 (15); HK Electric, 26 March and 25 August 2026; interim results, p. 1.

Watch the episode

EP03 · The Hong Kong power bill

Plays from YouTube in privacy-enhanced mode, only when you press play. Watch on YouTube

The return comes from one clause.

“The Permitted Return of HEC for each Year… shall be 8% of the total value of its Average Net Fixed Assets for that Year.”

Fixed assets are the power stations, cables and substations. The amount of electricity HK Electric sells has no place in that formula.

The agreement runs from 1 January 2019 to 31 December 2033. The government gives the reason for the long term: “to provide a stable environment for the power companies to make substantial and long term investments”. CLP’s agreement sets the same 8%.

The Permitted Return also pays the interest on what the company borrows, so I call it a return and keep the word profit for the company’s reported results. The part that reaches shareholders is a separate line in the accounts, the Net Return. Sources: the agreement, cl. 4(2) and 7(1); CLP’s agreement, cl. 4(2); GovHK.

The ten-year table

HK Electric Investments, Annual Report 2025

Read the table three ways.

The annual report carries a ten-year Scheme of Control statement. Switch the view to compare the years that matter. Percentage changes are my arithmetic from the reported figures.

Sales went down. The return went up.

Between 2019 and 2025, HK Electric sold 5.7% fewer units. The Permitted Return rose 25.8%, and property, plant and equipment rose 21.8%.

Units sold (million kWh)10,519 → 9,916−5.7%
Permitted Return (HK$m)4,285 → 5,391+25.8%
Net Return (HK$m)3,195 → 4,126+29.1%
Property, plant and equipment (HK$m)53,791 → 65,538+21.8%
Basic Tariff (cents per unit)101.3 → 122.9+21.3%

Ten-Year Scheme of Control Statement, Annual Report 2025, pp. 180–182. The Basic Tariff rose again to 127.9 cents in January 2026, 26.3% above 2019. Bars compare the two years within each row.

You pay for what it burns. It earns on what it builds.

January showed both at once. The bill went down 2.2%, and the Basic Tariff went up 5.0 cents, which HK Electric Investments described as an increase “reflecting ongoing capital investment”. In 2023 the fuel charge tripled and the Net Return went down.

Spread across the 9,916 million units sold in 2025, the Permitted Return of HK$5,391m comes to about 54 cents a unit. That figure covers interest to lenders as well as the return to shareholders. The Net Return alone comes to about 41.6 cents a unit.

Picture a taxi where the meter charges you for petrol at cost, and the driver’s pay is 8% a year of what the car is worth. Driving you further leaves the driver’s pay where it was. A bigger car raises it.

The people who wrote the contract saw the incentive coming.

Schedule 6, “Mechanism for treatment of excess generating capacity”, takes the cost of a generating unit that the system does not yet need out of the return base until the unit passes a reserve test. It excludes “any new gas combined-cycle generating units to be installed solely for the purpose of enabling HEC to meet mandated targets” on emissions. The 2025 annual report says: “No excess capacity adjustment was made in 2025 and 2024.”

The check that remains is the Development Plan. Under clause 3(1)(a), projected levels of the Basic Tariff are set through periodic Development Plan reviews, “subject to the approval of the Executive Council”. The current plan runs from 2024 to 2028. L13, the fourth 380-MW gas-fired combined-cycle unit, is due for commissioning in early 2029. The agreement ends on 31 December 2033. Sources: the agreement, cl. 3(1)(a) and Sch. 6; Annual Report 2025, p. 180; 2025 annual results, p. 2; 2026 interim results, p. 1.

If a contract pays your supplier a return on what it owns, the investment plan is the page to read.

The same structure turns up in energy, outsourcing and managed-service contracts. A pass-through line follows an input cost. A return on assets follows what the supplier builds or buys, and moves with the investment plan.

Before signing one, I would find three things: what the return is a percentage of, who approves additions to that base, and what takes an unneeded asset back out of it. In HK Electric’s agreement the answers are clause 4(2), the Executive Council through the Development Plan, and Schedule 6.

HK Electric Fuel Clause Charge, 2026, cents per unit. HK Electric’s monthly page, read 24 September 2026.
MonthJanFebMarAprMayJunJulAugSep
Cents35.435.434.030.426.031.341.957.360.7
Every other figure on this page. “Mine” marks my arithmetic from the reported figures.
FigureValueWhere it comes from
Permitted Return rule8% of Average Net Fixed AssetsHK Electric agreement, cl. 4(2), p. 5
CLP’s return rule8% of Average Net Fixed AssetsCLP agreement, cl. 4(2), p. 6
Agreement term1 Jan 2019 to 31 Dec 2033HK Electric agreement, cl. 7(1), p. 8
May to September fuel charge×2.33Mine: 60.7 ÷ 26.0
September average net tariff188.6 centsHK Electric press release, 25 Aug 2026
Units sold, 2019 and 202510,519m and 9,916m kWh (−5.7%)Annual Report 2025, p. 182; change mine
Permitted Return, 2019 and 2025HK$4,285m and HK$5,391m (+25.8%)Annual Report 2025, p. 180; change mine
Net Return, 2019, 2022, 2023, 2025HK$3,195m, 3,946m, 3,810m, 4,126mAnnual Report 2025, p. 180
Property, plant and equipment, 2019 and 2025HK$53,791m and HK$65,538m (+21.8%)Annual Report 2025, p. 181; change mine
Basic Tariff, 2019, 2025, 2026101.3, 122.9, 127.9 centsAnnual Report 2025, p. 182; Tariff Review 2026, slide 2
Fuel Clause Charge, 2022 and 202327.3 and 82.5 cents (×3.02)Annual Report 2025, p. 182; multiple mine
January 2026 net tariff163.3 cents, −2.2%HKSAR Government, 18 Nov 2025
January 2026 componentsBasic 122.9 → 127.9; fuel 44.1 → 35.4Tariff Review 2026, slide 2
Permitted Return per unit sold, 2025about 54 cents (Net Return 41.6)Mine: 5,391 ÷ 9,916 and 4,126 ÷ 9,916
Gas share of outputnearly 70%2026 interim results, p. 1
L13380 MW, early 20292026 interim results, p. 1; 2025 annual results, p. 2

HK$m is millions of Hong Kong dollars. A unit is one kilowatt-hour. I rounded percentages to one decimal place.

Make the mechanism readable.

I build presentations and interactive pages that let people follow a claim to the document behind it. If a contract, a pitch or a board paper rests on a mechanism like this one, I can help lay it out.

Start a brief

Source and scope.

Independent analysis. HK Electric, HK Electric Investments and CLP did not commission or endorse this piece. It describes how the agreement works and makes no judgement on the tariff or the investment plan. Commentary and analysis, based on public documents. Not investment advice. Corrections: hello@enzwa.com.